Documentary reference. These role and gate descriptions explain a method. They are not active commands, automated approvals or a running production system. Use only the guidance relevant to your project.

CHAPTER 11

Roles, decisions and handoffs

On this page

Version 1.3 · 17 September 2026. Use alongside the Workflow, Instruction manual and Prompt library. This is a recommended operating design, not a claim that the historical films used a full crew.

Assign functions, not headcount

A role is a responsibility that must be fulfilled, not necessarily a separate person or agent. One creator can hold all roles; a larger crew can split them. Assign one named owner and, where useful, a backup to each active function. Record the assignment in 00_admin/roles.md. A service, model or generation tool is not an accountable owner.

For each gate below, A is the single accountable function that accepts or holds the decision; R performs the work and supplies evidence; C is consulted before the decision when affected; I receives the result. An A may also execute work; the map normally lists additional performers under R. A role title does not grant account access, spending or publication authority. Record those delegated limits explicitly. Existing valid user approval remains effective within its scope.

The director owns creative acceptance. QC owns the truth of its review findings and pass/fail record. Rights/release review owns its clearance assessment. The project owner owns publication and any material budget/scope expansion. These are separate decisions: a director cannot turn an unheard soundtrack into a QC pass, and the project owner cannot label an unresolved clearance as verified. Resolve a failure, change the permitted requirement with recorded authority, or hold the affected release.

Lean review passes

One creator can complete these as separate passes. Assign people only when the actual project needs collaborators.

Pass Decision and record
Producer Scope, cumulative spend, delivery reserve and authority envelope
Writer What changes for the character or audience; beat map and timed script
Director What the viewer must notice and feel; performance and scene intention
Art/continuity What stays fixed and what changes deliberately; scoped canon and references
Camera/light How framing, movement and motivated light express the beat
Sound What is heard, withheld or bridged; cues and listening evidence
Editor Why this interval and cut advance meaning; selects and change notes
QA/release Actual master, applicable rights, destination and recoverable handover

Prithu's G0–G5 labels are summary groups only: brief maps to G00–G01; story/canon to G02–G05; generation to G06–G07; clip/seam to G08–G11 as applicable; picture/sound to G12–G14; master/delivery/archive to G15–G19. Existing G00–G19 records remain authoritative. Reading a summary never passes its underlying gates.

Specialist coverage within these functions

The department matrix maps thirty-one specialist areas to these nineteen functions, with intent, inputs, decisions, deliverables, handoffs, acceptance and tool limits. Each machine role contract lists its specialist_modules; the module contracts are their canonical detailed source. Use copyable M01–M31 prompts only for the current need. A selected module does not create another agent, confer authority or require all department outputs at every stage.

Role cards

EP — Executive producer / project owner

PM — Producer / production manager

WR — Writer / story editor

DR — Director

CV — Creative director / visual development

DP — Cinematographer / virtual camera lead

PD — Production designer / world and prop lead

CC — Character and continuity supervisor

SB — Storyboard / previs artist

ML — AI model and prompt lead

AR — Asset librarian / reference manager

GO — Generation operator

FX — VFX / compositing

ED — Editor

SD — Sound designer / dialogue / voice / music lead

CF — Colorist / finishing

QC — Quality-control and rating reviewer

DA — Delivery, archive and handover owner

Responsibility map by workflow phase

Roles not listed in C/I need no routine involvement. This keeps consultation proportional. The gate register below defines the narrower approval decisions within each phase.

Workflow phase / deliverable A R C I
0 Recovery and active-version reconciliation PM AR, DA CC, ED, QC EP, DR
1 Brief, scope and production mandate EP PM, WR DR, LR, DA CV, ML
2 Script and causal story lock DR WR ED, SB, SD, PM CV, CC
3 Canon and visual development DR CV, PD, CC DP, SD, LR AR, ML, SB
4 Approved source registration and availability AR GO, CC DR, CV, PD, LR ML, PM
5 Scene packets, boards and camera coverage DR SB, DP, ML CC, ED, SD, PD, PM GO, AR
6 Composer preflight and spend eligibility PM GO ML, AR, CC, LR DR
7 Authorized generation and job capture PM GO ML, AR QC, CC, DR
8 Clip acceptance and continuity handoff DR QC, CC DP, ML, ED, SD AR, GO, PM
9 Edit and scoped VFX repair DR ED, FX CC, DP, QC, PM CF, SD, DA
10 Sound and creative mix lock DR SD ED, QC, LR CF, DA
11a Finishing and creative master acceptance DR CF ED, FX, SD, DP QC, DA
11b Technical master review QC CF, DA CC, SD, ED DR, PM, EP
12a Rights / provenance readiness LR AR, PM SD, CV, DA EP, DR
12b Publication and submission EP DA QC, LR, PM, DR AR, ED
13a Archive and recoverable handover DA AR, ED, SD, CF PM, QC EP, DR
13b Lessons and workflow update proposal PM QC, ML, CC All affected functions EP, DR

Gate register: evidence and accountable decisions

No gate requires a meeting by default. A dated record with the decision, artifact version and evidence is sufficient. One valid approval may cover repeated unchanged actions within a bounded scope.

Gate Decision and evidence required A R Hold / escalation
G00 Current project/master and active records reconciled PM AR, DA Ambiguous versions held; seek source evidence
G01 Brief, budget, deadline reserve and delegated authority approved EP PM Missing mandate or unsupported deadline assumptions
G02 Script has coherent setup/action/consequence and feasible runtime DR WR, ED Revise before buying missing story coverage
G03 Canon/version and visual/state references creatively approved DR CV, PD, CC Conflicting designs resolved or versioned
G04 Active IDs open correct approved assets with provenance scope AR CC, GO Stale, unrelated or unresolved reference held
G05 Scene packet, board/coverage, incoming/outgoing state approved DR SB, DP, ML, CC Split incompatible actions/camera changes
G06 Full actual composer and cost/attempt envelope pass preflight PM GO No submission on truncation, wrong chips or excess scope
G07 Submission outcome/job ID and actual cost reconciled PM GO, AR Uncertain launch checked before retry
G08 Clip has documented review coverage, accepted interval and handoff DR QC, CC Required unknown/failure blocks continuation
G09 Retry/repair within remaining limits and causal plan PM ML, QC, CC Creative change to DR; new funds to EP
G10 Material canon/story change and affected-shot plan accepted DR CC, WR, AR, PM Invalidate only affected approvals; EP if scope/budget changes
G11 Continue, fallback, pivot or defer before reserve is consumed EP PM DR assesses coherent fallback; no silent deadline overrun
G12 Picture lock and VFX changes preserve story and joins DR ED, FX, CC Repair/review changed boundaries
G13 Mix creatively accepted with listening evidence DR SD Missing listening/sync evidence stays pending
G14 Finished look/crops/text accepted against delivery brief DR CF New grade/crop changes go back through affected review
G15 Actual master passes documented technical/playback QA QC CF, DA, SD No status inferred from export button or thumbnails
G16 Required rights/provenance/release evidence assessed LR AR, PM Unresolved applicable requirement flagged to EP
G17 Exact master and destination authorized for publication EP DA Requires G15/G16 readiness and creative acceptance
G18 Uploaded result/submission receipt matches approved master/link DA GO, AR Keep old valid version until replacement verified
G19 Archive relinks, omissions declared, lessons and status reconciled DA AR, ED, SD, PM Missing source/stem/project explicitly recorded

Anti-drift control ownership

Control Responsible functions Accountable decision Required handoff
Freeze identity, world, prop and state rules CV, PD, CC DR / G03 Versioned canon → AR/ML
Match actual asset, ID and scoped visual authority AR, GO AR / G04 Checked bundle → ML/GO
Keep one readable action and a coherent camera setup ML, DP, SB DR / G05 Approved packet → GO
Verify full text and real attachments at spend time GO PM / G06 Composer evidence → job ledger
Prevent a rejected clip seeding its descendants CC, AR DR / G08 Approved boundary only → next packet
Bound retries and revise the failed component ML, QC, PM PM / G09 Diagnosed repair → GO; new scope → EP
Track material change and downstream invalidation CC, WR, AR, PM DR / G10 Dependency list → all affected departments
Protect edit/QA/upload time and choose pivot early PM, DR EP / G11 Frozen feasible plan → ED/DA
Audit every similar join after one reference flash QC, ED QC / G15 Boundary defect sweep → ED/FX
Preserve approved score during picture repair ED, SD DR / G12–G13 Revised EDL and unchanged/changed audio declaration → CF
Prove final file and submitted version separately DA, QC QC / G15; DA / G18 Checksum + upload/receipt mapping → EP

Solo creator

The creator holds EP/PM/DR and the specialist functions; an assistant can prepare packets, inventories, prompts and QC evidence within authorized scope. Make three distinct passes: creative build, evidence review, release decision. A pause and fresh viewing can reduce familiarity bias but does not make a solo review independent. For a complex or high-consequence gap, seek targeted external review rather than automatically creating nineteen agents.

Minimum records: brief/canon, active asset list, shot/job/continuity ledger, edit decisions and delivery receipt. Each row still names the responsible function, even if the same person occupies every role. Before a paid generation, act as PM/GO; after it, act as CC/QC; creative acceptance remains DR. This prevents enthusiasm for a render from substituting for a completed review.

Small crew — suggested four-person grouping

Owner function group Combined roles Practical separation
Creator / producer-director EP, PM, WR, DR; LR coordination Owns mandate and creative acceptance; delegates only bounded execution
Visual and generation lead CV, DP, PD, SB, ML, GO Authors/operates clips; does not independently certify its own results
Continuity and media lead CC, AR, QC, DA Verifies reference chains, joins and delivery; consults specialists for audio/finishing
Post-production lead ED, FX, SD, CF Builds edit/mix/finish; receives QC findings from another owner

This is a starting allocation, not a staffing requirement. In a two-person crew, combine creator/continuity on one side and generation/post on the other, with cross-checks for clips and final files. If either person cannot assess a discipline, mark the limit and obtain focused review rather than fabricate approval. LR coordination does not imply legal qualification.

Full virtual studio

Assign named departmental owners for the nineteen functions and split specialist subroles only where the workload warrants it. PM manages a shared schedule and bounded work orders; DR controls creative lock; AR owns the active asset registry; CC owns continuity state; QC reviews separately from the departments producing candidates. EP authorizes scope/funds/release, and DA carries the exact master through publication/archive.

Separate concurrent work by scene/asset ownership and immutable canon version. A worker may return a candidate but cannot promote it into the active registry without the designated approval. Reserve platform operation to an assigned operator per account/project to avoid competing composer edits and duplicate jobs. Creating agents, hiring people or granting account permissions remains a separately authorized action; this role system performs none of those actions.

Handoff contract and disputed decisions

Every material handoff contains: project/scene/shot ID; canon and artifact versions; source paths/platform IDs; current lifecycle status; allowed use and limits; evidence reviewed; unresolved defects; downstream dependencies; cost/attempt scope if relevant; sender; recipient; accountable gate owner; timestamp. Receiver acknowledges that the files open and the version is usable. Approval of a thumbnail alone is not acceptance of full-motion footage.

For disagreement, identify the criterion and evidence before escalation. Technical measurement goes to QC; creative intent to DR; factual reference/state conflicts to CC/AR then DR; schedule/spend to PM then EP; rights uncertainty to LR and the appropriate source/adviser. A favourable score never overrides a failed hard gate. Record accepted minor deviations with their scope; a material change goes through G10. The requested Divinium rubric remains unresolved, so no role may claim to have applied it.

Validation cases and evidence limits

These are documented decision walkthroughs, not live production tests. Historical Apple drift and Night Watch repairs motivated the controls; the full role arrangement is newly proposed and was not retrospectively attributed to those productions.

Approved cinematic intent

ED/DR may plan offscreen action, montage, ellipsis or stylized physics where the intended audience inference remains clear. Explicit visible mechanics are required only when the brief/scene tests require them. This does not permit relabelling an accidental missing story beat after failure; a changed intent uses the normal creative-change decision.